Executed Project : Arab Bank- Ordinary Scaffolding

Power Steel has developped :

- Facade retention system for rehabilitation of old buildings.
The advantage of this system that it can be reused as ordinary formwork for proping concrete slabs. The basic elements are the followings : Scaffold double props with diagonal reinforcement, Tube connectors, Cross bracing, Inside joint, Facade tie.
Cf The rehabilitation of the Grand Serial.

- Scaffolding drop head system easy to use and very functional. After 7 days of poouring concrete on a slab, we can dismantle all horizontal from work accessories : girders, beams, panels without removing the vertical supporting frame. It is very useful for residential and commercial buildings and for bridges.

- Facade Scaffolding - coupler system containing a side ladder for fast climbing. It is composed from vertical frames an connectors and can be erected very quickly on sloppy groundat production rate of 400m2/day (4 skilled labors). Very useful for residential tower and high rise buildings.

- Facade Scaffolding - pin system containing a side ladder for fast climbing. It is composed from vertical framesand cross bracers to be pined on it. It has a production rate of 450m2/day (4 skilled labors) and can be very useful on flat ground.

Brace Frames for
single-sided formwork


Al Sahab Building Raouche - Facade Scaffolding -
Coupler system

Decking Systems Example


Outside Stairs for Mkalles Immobiliere
Holdal Building


Circular Structure - Stairs Mkalles